SVC-01
Daily Capacity & Dispatch Board
What every bay is actually producing right now, not just what is assigned to it.
One row per bay, updated through the day. A bay with no time logged in the last two hours needs a reason, not silence.
Bays
| Bay | RO # | Technician | Job type | Waiter / drop-off | Promise time | Last time logged | Status / reason if stuck |
|---|---|---|---|---|---|---|---|
Capacity utilization
| 1 | Bay-hours actually produced | |
| ÷ | Bay-hours available | |
| = | Utilization 85-90% bay-hours produced ÷ bay-hours available — PROPOSED, pending specialist review |
Rates this board is measured against
- 85-90%
- bay-hours produced ÷ bay-hours available — PROPOSED, pending specialist review
- 1.9-2.2
- PROPOSED, pending specialist review
A full board and a productive board are not the same thing. This form exists to catch the difference before the customer does.